Download MOB app forbetter experience
DownloadConstruction Material Buying Guides
In-depth pricing, brand comparisons and buying tips for cement, tiles, pipes, paints and electricals — written for builders, contractors and homeowners in Bengaluru and Mumbai.

House Construction Cost in India (2026): Cost per Sq Ft, a Step-by-Step Calculator and the Costs Nobody Mentions
Most Indian homes cost about ₹1,600–₹2,500 per sq ft to build at standard finish, but the number on a contractor's quote is rarely the number you finally spend. This guide gives tier-wise rates, a calculator you can repeat on paper, a cost breakdown, and the extras that add another 15–25%.

Ready-Mix Concrete vs Site Mix: Compare Control, Logistics and Pour Risk — Not Only ₹/m³
RMC is produced under plant-controlled batching and can make larger continuous pours easier, but the job still succeeds or fails at the site: access, arrival sequence, slump acceptance, pumping, placement, vibration, sampling and curing. Compare total placed cost and risk, not the concrete rate alone.

CPVC vs UPVC vs PVC Pipes: Choose by Water, Temperature and System — Not Colour
CPVC, UPVC and PVC should not be chosen as three prices for the same job. Treat each as part of an application-specific system. Confirm fluid, temperature, pressure, pipe series, diameter, fittings and joining method, then keep pipes, fittings and solvent products compatible.

River Sand vs M-Sand vs P-Sand: Which to Use for Concrete, Plaster and Masonry?
River sand, M-sand and P-sand are not automatic winners or losers. Choose by grading, silt or fines, particle shape and the job, test the actual supply, and buy by measured quantity and delivered quality.

PPC vs OPC Cement in India (2026): Which One Should You Actually Use for Your House?
For most Indian homes, PPC is a sound, economical choice for masonry, plaster, foundations and—with proper curing and formwork timing—even RCC. OPC 43/53 earns its higher price where early strength matters. This guide explains the real difference, shows a 2,000 sq ft cost example and lists the site checks that protect you from old, short-weight or wrongly stored cement.

TMT Bars in India (2026): Fe500 vs Fe500D vs Fe550D—How to Choose, Calculate and Check Before You Pay
TMT bars are typically quoted around ₹58–₹72 per kg in 2026, and steel is one of the biggest line items in a house. This guide explains Fe500 vs Fe500D vs Fe550D in plain language, gives the weight-per-metre formula, shows a 2,000 sq ft steel budget and lists the gate checks that catch underweight or unmarked bars.

House Construction Stages: A Material Checklist and What to Buy at Each Stage
A house moves through about 12 stages. Buy for the stage you are about to start, tie each purchase to an approved drawing and a delivery slot, and test and record before you close each stage.

Terrace Waterproofing Methods in India: What Works, What Fails and How to Pond-Test It
A terrace waterproofing system succeeds only when it matches the substrate, movement, exposure and final use of the roof. This guide compares common Indian methods, explains realistic budget bands and shows how a controlled ponding test should be planned, observed and documented.

How Many Tiles Do You Need? Calculate Layout and Wastage Before Buying One More Box
Tile quantity is not room area plus a blind 10%. Measure each surface, subtract true exclusions, add skirting separately, study the layout and cuts, then convert the adjusted area into full boxes using the exact box coverage. Buy one batch where possible and keep suitable spare pieces for repairs.